Load carrier and load
The load carrier’s design, dimensions and condition, plus the load’s weight and centre of gravity.
1 / 3
Loading 3D model… The load carrier’s design, dimensions and condition, plus the load’s weight and centre of gravity.
Passage widths, pickup and placement geometry, and traffic inside the facility.
The number of transport tasks, available charging periods and how tasks are requested.
| Product name | VNA-1590 AGV VNA |
|---|---|
| Pallet type | Open pallet / closed pallet |
| Rated load capacity | 1500 kg |
| Load centre distance | 600 mm |
| Standard lifting height | 9000 mm |
| Travel speed (laden / unladen) | 1.6 / 1.8 m/s |
| Cage storage [3] | Optional |
| Pallet storage [5] | Optional |
| Weight (including battery) | 7100 kg |
|---|---|
| Truck dimensions (L × W × H) | 3400 × 1550 × 4290 mm |
| Fork dimensions (L × W × H) | 1220 × 125 × 50 mm |
| Outer fork width | 600 / 650 mm |
| Minimum turning radius | 2240 mm |
| Floor conditions (gradient / step / gap) [1] | <5% / 10 mm / 30 mm [1] |
| Navigation type | Laser SLAM |
|---|---|
| Navigation positioning accuracy [2] | ±10 mm |
| Navigation angle accuracy [2] | ±1° |
| Number of lidars | 1 (P+F R2000) + 4 (C2) + 1 Mid360 |
| Wi-Fi roaming | Standard |
| 3D obstacle avoidance [3] | Optional |
| Pallet recognition [3] | Standard |
| HMI display | Standard |
| Braking distance (1 m/s / 1.5 m/s) | ≤30 cm / ≤50 cm |
| Fork height protection | Standard |
| Battery specification | 48 V / 300 Ah (lithium iron phosphate) |
|---|---|
| Battery runtime | 8 h to 10 h |
| Charging time (10% to 80%) | 3 h to 4 h |
| High-bay pallet recognition [3] | Optional |
Fork spacing: 600 or 650 mm. The drawing also includes 550 mm; confirm availability of this configuration during selection.
The budget includes vehicles, process integration, software, infrastructure preparation and support. A quotation requires information about load carriers, routes and throughput. What affects AGV pricing?
Start with a description of your transport tasks and load carriers. Together, we will define the requirements for workstations, routes, safety and integration. Describe your process
This site uses cookies for core functionality and basic analytics. By clicking "Got it", you accept their use.
Privacy policy